Mr and Mrs Liu bought a block of land in Melbourne's south-east and are about to engage a builder for a double-storey home. The builder asked for a 15% deposit up front and said ‘half the price is due before frame stage’. Is that acceptable? Under Victoria's Domestic Building Contracts Act 1995, generally not: for contracts of $20,000 or more the deposit generally cannot exceed 5%, and stage payments are also capped at statutory percentages.
At a glance
- Major domestic building contracts must be in writing and carried out by a registered builder.
- Deposit caps: 10% for contracts under $20,000, and 5% for contracts of $20,000 or more.
- Progress payments must be tied to construction stages and cannot exceed statutory percentages.
- The law implies warranties into domestic building work, and building claims generally must be brought within 10 years of the occupancy permit or certificate of final inspection.
- From 1 July 2026, a new ‘first resort’ Home Warranty Scheme applies to residential work of three storeys or less with a contract price of $20,000 or more.
What to confirm before signing
First, check the builder's registration on the Building and Plumbing Commission (BPC) public register. Second, the contract should set out the full scope of works, plans and specifications, total price, start and completion dates, payment stages, and who obtains the building permit. Provisional sums and prime cost items in the contract are estimates and the actual cost may be higher, so ask the builder to estimate them reasonably and list them.
If you are an overseas owner relying on relatives or a project manager in Australia to oversee the build, the contract should state who can approve variations, accept stages and sign off payments, to avoid later disputes about the scope of authority.
The law also gives owners a cooling-off period: within 5 clear business days of signing a major domestic building contract, the owner can generally withdraw by written notice, although the builder may charge certain reasonable costs.
Statutory limits on deposits and progress payments
Consumer Affairs Victoria sets out the statutory stage payments as follows (for a contract covering all stages): after the deposit, base 10%, frame 15%, lock-up 35% and fixing 25%, with the balance paid on completion. Contracts covering only some stages have different percentages. The builder can only claim a stage payment once that stage is complete, and it is best to have the work checked by the building surveyor or an independent inspector before you pay.
Variations must be documented in writing. Apart from limited exceptions (for example, a variation that needs no change to permits and adds no more than 2% to the contract price), the builder generally must first give written notice of the cost and time impact and obtain the owner's agreement. Verbally agreed ‘small changes’ often end up at the centre of disputes.
Building insurance: the new Home Warranty Scheme
The former domestic building insurance was ‘last resort’ cover, claimable only if the builder died, disappeared or became insolvent. Under the Building Legislation Amendment (Buyer Protections) Act 2025, from 1 July 2026 newly contracted eligible work is covered by the Home Warranty Scheme administered by the BPC: owners can claim when a problem is first identified, and cover includes lost deposits, incomplete work and defective or non-compliant work. Work contracted before 1 July 2026 is generally still dealt with under the old arrangements.
What if there are defects or a dispute?
- Take photos and videos, note when you found the problem, and keep all contracts, plans and correspondence.
- Notify the builder in writing, listing the defects and allowing reasonable time to fix them.
- Consider obtaining an independent building inspector's report as evidence.
- Seek dispute resolution help from the BPC, or claim under the Home Warranty Scheme; the BPC can also order builders to rectify work.
- If unresolved, you can apply to VCAT; generally you first need to go through the BPC's dispute resolution process.
During a dispute, an owner who simply stops paying or engages someone else to fix the work may end up in breach or lose some claim rights. Get legal advice before you act.
Frequently asked questions
Do renovations get the same protection?
Generally yes. Residential renovations, extensions and alterations above the statutory threshold are major domestic building contracts, so deposit caps, written contract requirements and statutory warranties apply.
The builder wants more than a 5% deposit. What should I do?
For contracts of $20,000 or more, the deposit generally cannot exceed 5%. Ask the builder to amend it to the statutory limit, and have a lawyer review the contract before you sign.
My contract was signed before 1 July 2026. Does the new scheme apply?
Generally no – the old domestic building insurance arrangements still apply. Check your insurance certificate and seek legal advice for your situation.
I found defects several years after completion. Can I still claim?
Building claims generally must be brought within 10 years of the occupancy permit or certificate of final inspection, but other time limits may also apply, so seek legal advice early.
My builder became insolvent. What about the money I've paid?
Find out quickly which insurance or warranty arrangement applies and claim within time. Under the new scheme, lost deposits and incomplete work are covered.
Chua Tan Associates has practised in Melbourne since 1990, acting on property purchases and sales, conveyancing, building contracts and property disputes in Mandarin, Cantonese and English. Tan Chua has long handled property and commercial matters for Melbourne's Chinese community. For help, call 03 9602 3988 or contact us online. We can meet at our Melbourne CBD office or by video.
This page provides general information only and is not legal advice.